+1 818 240 1920

info@washingtoncapital.com

143 South Glendale Ave

Suite 200

Glendale, CA 91205 - USA

Project List

Utility Projects

 

ManuFactor builds power plants using a variety of fuel sources, including coal, gas, oil, nuclear, and wind.

 

Substation and electrical infrastructure projects for utility and industrial customers face a number of challenges in today's environment. Increasing demand and workload peaks, an aging workforce and infrastructure serve as drivers for outsourcing these complex projects.

Mining Projects

 

ManuFactor is a leading specialist in the mining sector. We have over 40 years’ experience in working with mining clients.

 

The Metals & Minerals Industry encompasses everything from resource mining to the primary and secondary processing of Metals & Minerals. ManuFactor provides tools that allow our clients to target actionable project spending opportunities and analyze project spending.

Oil & Gas Projects

 

We utilize engineering methodologies and profitably produce, transport and distribute oil and gas products.

 

Our Oil & Gas coverage includes five distinct sectors: Terminals - Pipelines - Production & Processing - Alternative Fuels - Petroleum Refining. Our market intelligence is built upon decades of industrial experience supported by teams of researchers in strategic locations throughout the world.

Surface Water Treatment

 

The systems required the installation of under & above ground conduit with associated supports & accessories.

 

We have produced junction and pull boxes, electrical distribution equipment, panel boards, disconnects, 600V cable and building wire, instrumentation and control cable, 600V terminations and instrumentation and control cable terminations.

Haynes Generating Station

 

Haynes Generating Station is a natural gas and steam power plant located in the city of Long Beach, California.

 

We managed crews on the installation of conduit, wire, and equipment associated with the temporary power for the entire project site. The work included approximately 5,000 linear feet (LF) of duct bank, 5kV and 600V wire installation, and the mounting of four large transformers as well as 6 distribution panels.

Mass. Electric Construction

 

In February 2012, Mass. Electric Construction Co. began the replacement of the electrical distribution.

 

Farley and Pavilion Buildings at Children’s Hospital Medical Center (CHMC) are situated in Boston, Mass. The project was required to increase the efficiency of the system and addressed updates to the electrical code.